In this project we are implementing a new factory in Spain in the Luxury Manufacturing Sector of a worldwide brand of recognised prestige using the project integration management (PIM) method.
Cubicoff participates by providing comprehensive assistance in all phases of the project including detailed engineering, piping and support structures for the Agadir desalination plant in Morocco.
In this project we provided the technical support required for implementation of a new passport customisation centre in Sofia (Bulgaria).
Project PIM, including design and obtaining permits and licences for new plastic waste processing and classification plants in Laguna Larga in the municipal district of Alcalá de Guadaira.
Comprehensive management using the PIM (project integration management) method including design and processing permits and licences for new electrical and fire-protection facilities and a WWTP in the plastic waste...
En este proyecto se realizó el cálculo mediante elementos finitos en Ansys de una estructura metálica de Izado para una importante empresa del sector industrial.
An entire engineering team has been working on supervising the design of civil works, steel structures and electrical installation in the back office for the passport control facilities in Kampala, the capital of Uganda.
We provided technical assistance for upgrading a lime process plant for Calgovsa (Estepa, Seville).
In this project we conducted the FEM (finite element method) calculations of the metallic structure of the olive oil tank for an industrial plant and optimisation of the same to extend its useful life.
In this project, executed in the PMP modality, we carried out the site and construction management for implementation of the new passport factory in Dhaka (Bangladesh).
In this project we carried out the basic and detailed engineering for extension of the MARPOL waste plant and the new oily water treatment plant in the Port of Algeciras.
In this project we carried out the design engineering and calculation of the metallic maintenance platforms for a thermo-solar plant in Aldeira (Granada) using CYPE3D software.
This project involved finite element calculation in Ansys of a steel reinforcement structure for a biomass boiler in the oil production plant in Brenes (Seville).
In this project we conducted the FEM calculations of the Aguas Teñidas mine thickening tank in order to analyse the weak points of the collapsed structure and develop a new structural solution. We used Ansys software on this job.
In this project we conducted the FEM calculation and design of a series of Superduplex gutters and provided an executable solution during the maintenance shutdown of the industrial plant at the Las Cruces copper mine.
In this project we carried out the CFD (computational fluid dynamics) simulation for the design of the new pump intake for the CSP cooling tower in a thermo-solar power plant in Palma del Río (Córdoba).
We conducted the calculations in this project for a steel platform to support equipment and electrical cells for a stained-glass plant in Alcalá de Guadaira (Seville) using CYPE3D software.
In this project we designed a special tool for the aeronautical sector and subsequent FEM calculation using Ansys finite element software to determine the stress and strain on the part during the elongation process.
In this project we performed the design and FEM calculation of a railway bogie to verify its performance before commissioning.
Implementation using the PIM method of a new structural aluminium lifting system factory. The project consisted of integrating new layouts, adapting existing buildings and erecting a new office building.
In this project we designed the new layout and obtained certification of the Majada CSP sealing steam line. Site management and as-built drawings.
In this project we conducted the stress and support analysis of piping deployed in the Algeciras loading facility (Gibraltar).
In this project, the FEM calculation and design of the anchors or supports for a hydrogen station was conducted, considering the possibility of seismic risk in Chile.
In this project we performed an analysis of the real situation of the piping to determine the probable cause of leaks and to provide solutions for the PSV in the Helioenergy Solar Platform.
In this project for the Akoti-Paboase gold mine in Ghana, we performed the detailed engineering of the design, 3D-modelling and stress calculation of the drainage lines, compressed air and fresh water supply to be executed in a mine shaft at a depth of 2 km.
Cubicoff provides Design Authority services in the renewable energy sector for the Level C tests to be carried out in various thermo-solar plants.
In this project we carried out the basic and detailed engineering of a new strontium sulphate processing plant. New TS and LV line for Santa Aurora Montevive mine.